Home / Projects / Lake Toxaway
Transylvania County, North Carolina · 2026
Lake Toxaway
[PLACEHOLDER — one-sentence summary. A lakeside new build where the glazing had to carry the elevation.]

Openings
31 units
Systems
Tilt & turn · Fixed · Sliding door
Glazing
Triple, argon filled
Finish
Matte black, PVDF
The brief
What the project needed
[PLACEHOLDER — two or three sentences. What the architect or owner was trying to achieve, in plain terms. Not “a stunning modern residence” — something specific: the west elevation faces the lake and they wanted the glass to disappear.]
The problem
What made it difficult
[PLACEHOLDER — the real constraint. A masonry opening that came in out of square. An elevation that takes weather all day. A twelve-foot span with a structural head that could not move. A framing schedule that left six weeks. This is the section people actually read.]
Optional pull-out. One line worth isolating — a number, a decision, a moment. One per page at most.
The decision
What we specified, and why
[PLACEHOLDER — the reasoning. Why tilt & turn rather than casement here. Why PVDF rather than powder coat at this elevation. Why a sliding run rather than a bi-fold. State the trade-off you accepted, not just the choice you made — that is what makes it read as experience rather than a brochure.]
The outcome
How it turned out
[PLACEHOLDER — what the decision bought. Delivered in X weeks, all 31 openings first time, no site rework. Or honestly: one unit had to be remade and it cost two weeks. A project story with a hitch in it is more credible than one without.]
The project
Photographs

West elevation, wide exterior — the twelve-foot sliding run at centre

Living room, looking out toward the lake

Detail, sightline at the frame junction

The sliding run, open onto the deck

Hardware detail at the threshold

Dusk exterior, west elevation
Walkthrough
On site
▶
VIDEO PLACEHOLDER — 16:9. Set visible:false on this whole section when there is no video.
Working on something similar?
Send the drawings
Back within two business days: a price, a confirmed lead time, and a check that the rough openings work.
2 business days
Price, lead time and RO check
10–14 weeks
From confirmed technical drawings
10 years
Product warranty, whoever installs
